Relocating or installing a production line is not simply a matter of dismantling and reassembling machinery. Every day of downtime costs money, and every error on site translates into delays at start-up. That is why planning carries as much weight as execution: a well-prepared project reduces surprises, rework and dead time.
Survey and planning: the work that comes before the site phase
Everything starts with an accurate survey of the existing situation. Layouts, dimensions, footprints, underground services, anchor points and utility connections are documented at both the origin and destination plants. Comparing the two layouts immediately highlights critical issues: floor load capacities, clear heights, access openings and vehicle routes.
The programme and the operational plan are drawn up from this stage. Before dismantling begins, it is advisable to define:
- the dismantling sequence and the reassembly sequence, designed to work together;
- the marking of components, wiring and piping, backed by photographic records;
- the lifting and handling equipment required;
- the safety measures and coordination with the other contractors on site;
- the shutdown windows agreed with production.
Dismantling and logistics: order and traceability
Dismantling must be carried out methodically. Each unit is disconnected, labelled and, where necessary, protected or packed for transport. Good traceability of components avoids searching and guesswork during reassembly, especially when the line includes hundreds of similar parts.
Logistics is where many projects lose time. Permits are needed, along with abnormal load transport when dimensions require it, customs formalities for international relocations, and a realistic estimate of delivery times. Scheduling the arrival of materials in installation order, rather than loading order, allows work to proceed without build-ups and without unnecessary handling on site.
Reassembly, alignment and start-up
At the destination site, work begins with the foundations: checking the bearing surfaces, setting out, positioning the machines and fixing them in place. Next comes the most delicate stage, alignment. Levels, flatness, axes and the relative positions between machines must be checked with suitable instrumentation, because a minimal deviation at the start of the line can become a quality or wear problem downstream.
Once the mechanical, pneumatic, hydraulic and electrical connections are complete, start-up proceeds in stages: no-load runs, verification of safety devices, functional tests, then trials with product and ramp-up to full production alongside plant personnel. A final report with the measurements recorded gives the client a reliable body of documentation.
With a partner who manages the entire process, from survey to handover of the fully working line, timescales are shorter and responsibilities stay clear. This is the approach of E.C.A. Group Multiservice: specialist teams, defined procedures and close attention to detail at every stage of the project.